Software Versioning and Release Control for Laundry QC in Indonesia

Why auditors in Indonesia ask which software version produced a cleanroom laundry record, and how to run release control under CPOB, BPOM and PIC/S expectations.

6 min read
  • mid
  • laundry-qc
  • indonesia

Short answer: an auditor who looks at a particle count result or a release certificate from your cleanroom laundry wants to know the software that produced it was in a known, controlled state on that day. That means you can say which version ran, who approved it for use, what changed from the previous version, and what you checked before releasing it. If you cannot answer those four questions quickly, the record is harder to defend, however good the data looks.

This article is for quality and IT people at Indonesian cleanroom laundries, and for the pharmaceutical (CPOB), medical-device, cosmetics, food and electronics customers who audit them.

Why the version matters to an auditor

A laundry quality record is only as trustworthy as the system that created it. Software calculates pass/fail against limits, builds certificates and stores review sign-offs. If a formula, a limit or a report layout changed between two batches, the two records may not be comparable, and nobody can tell without version history.

Auditors usually come at this from three angles:

  • Reproducibility. Could the same inputs produce the same result today as they did last March?
  • Accountability. Who decided the change was safe to use in production?
  • Data integrity. Did an unplanned change alter or hide existing records?

The Indonesian context

Your pharmaceutical customers manufacture under CPOB (Cara Pembuatan Obat yang Baik), Indonesia’s GMP framework, which is overseen by the national regulator BPOM. BPOM is listed as a PIC/S participating authority, with accession shown as July 2012, so inspectors there work in an environment shaped by PIC/S thinking. PIC/S publishes Good Practices for Computerised Systems in Regulated GxP Environments (PI 011-3), which is a common reference point when computerised systems are discussed in inspections.

The WHO also publishes a Guideline on data integrity (TRS 1033, Annex 4, 2021) and guidelines on validation (TRS 1019, Annex 3), both listed on its GMP guidelines page. Neither is a laundry-specific rule, but they describe the expectations your customers’ quality units carry into supplier audits.

A practical point: your customer is usually the one auditing you. A CPOB-regulated drug maker has to qualify its suppliers, and a laundry that processes sterile-area garments is a supplier. Medical-device and electronics customers often audit against their own quality-system or customer requirements. Expect questions about your software to come through supplier questionnaires and on-site audits more than through direct regulator visits. I could not verify the exact CPOB clause wording on computerised systems from a public page while preparing this, so check the current CPOB text on the BPOM site rather than relying on a secondhand summary.

What “release control” means in practice

Release control is the routine that sits between “a developer or vendor has a new build” and “the laundry uses it for real batches.” A workable version for a mid-sized laundry has these parts:

  1. A change request. A short written record of what is changing and why: a bug fix, a new test type, a changed report layout.
  2. An impact assessment. Does this touch calculations, limits, user roles, audit trail or certificates? If yes, the testing is heavier.
  3. Testing in a separate environment. Not on live data. Use known inputs with known expected outputs.
  4. Quality unit approval. A named person approves the release in writing before it goes live.
  5. A version identifier. Every release gets a unique number, shown in the system and ideally printed on certificates.
  6. A rollback plan. If the release misbehaves, you know how to go back and what happens to records created meanwhile.
  7. A release log. Date, version, approver, test evidence reference, and who deployed it.

None of this requires heavy tooling. A controlled spreadsheet and a folder of signed PDFs can work, provided they are actually kept up to date.

Typical gaps found in laundries

GapWhy it hurts
Vendor updates arrive automatically with no reviewYou cannot show anyone approved the change
Version not visible on certificatesA record cannot be tied to the software that made it
Limits or formulas edited directly by an adminLooks like an unrecorded change to the rules
Test evidence kept on one person’s laptopLost when staff leave
No record of who has deployment rightsAccess control gap
Cloud service updates silentlyVersion history exists only on the supplier side

The last one is increasingly common as laundries move to hosted systems. It is not wrong, but your agreement with the supplier should say how you are told about changes and whether you can delay one until you have assessed it.

Keep it proportionate: the risk-based view

Not every change needs full retesting. A cosmetic fix to a screen label and a change to how a pass/fail limit is evaluated are very different. Write down a simple classification, for example minor, moderate and major, with the testing and approval each one requires. Auditors tend to accept a proportionate, documented approach more readily than a heavy process that is not followed.

Costs in rupiah, honestly

I will not quote figures here because they vary by supplier, scope and how much documentation you already have. What is worth budgeting for, in Rupiah or any currency, is time: internal hours for testing each release, quality-unit review time, and any supplier charge for release notes and test support. Teams often underestimate the review hours more than the software cost itself.

A starting checklist

  • Can you show the current version and the date it went live?
  • Can you list every version used in the last two years?
  • Is each release linked to an approval and test evidence?
  • Are version numbers on, or traceable from, your certificates?
  • Does your supplier agreement cover change notification?
  • Who in your quality unit can approve a release, and who covers when they are away?
  • Have you ever rehearsed a rollback?

Responsibility stays with you

Software can support your compliance work, but it does not make a laundry compliant, validated or certified. The quality unit remains responsible for deciding whether a system is fit for its intended use, and for the records of that decision. This article is general information, not legal or regulatory advice.

Talk it through

If you are setting up or tightening release control for your laundry quality records, we are happy to have a no-charge conversation about it with Teknologia Solutions. We can talk about your current process and where the gaps might be, using our laundry quality control system as one possible option, with no obligation.


Sources: BPOM (Indonesia); PIC/S members list; PIC/S publications, PI 011-3; WHO GMP guidelines page. Regulatory details change; verify against the current CPOB text, primary PIC/S and WHO documents and the current edition of any standard before relying on this article.