Short answer: an auditor who looks at a particle count result or a release certificate wants to know that the software behind it was a known, controlled version on the day the record was made. If you cannot show which version was running, who approved the change and what was tested before it went live, the record is harder to defend. That applies to a cleanroom laundry in Johor or Penang as much as to the pharmaceutical plant that buys its garments.

This article explains what Malaysian auditors tend to look for, where the expectation comes from, and what a practical release-control routine looks like for a laundry quality team. It is written at the quality-management level, not as an IT manual.

Why a version number matters on a laundry record

A cleanroom laundry produces records that its customers rely on: batch records, particle count results, ESD and moisture readings, bioburden-related checks, and the certificate that accompanies a released lot. These are produced or calculated by software, whether that is a purpose-built system or a spreadsheet with formulas.

If the calculation rules, pass/fail limits or certificate template change between March and April, then two records that look identical may have been produced under different logic. An auditor reading a record from March needs to be able to establish what the system did in March, not what it does today.

That is the whole point of version control in this context: it lets you reconstruct, after the fact, the conditions under which a record was created.

Where the expectation comes from in Malaysia

Pharmaceutical customers. Malaysia’s National Pharmaceutical Regulatory Agency (NPRA) states in its guidance documents that the PIC/S Guide to GMP for Medicinal Products and its Annexes are the standard it uses, and that Malaysia has been a PIC/S member since 1 January 2002. So a Malaysian drug manufacturer is audited against PIC/S-based expectations, and its quality unit will carry those expectations into supplier audits of service providers such as laundries.

The PIC/S Annex on computerised systems mirrors the EU GMP Annex 11. The published Annex 11 text is short on this topic but clear in direction:

  • Changes to a computerised system, including configuration, should be made in a controlled manner under a defined procedure.
  • Where risk assessment supports it, the system should record GMP-relevant changes and deletions in an audit trail, with the reason documented, and that trail should be reviewed regularly.
  • Systems should be periodically evaluated, and the evaluation should include things such as upgrade history, deviations and incidents.

PIC/S also publishes a separate guidance, PI 011-3, Good Practices for Computerised Systems in Regulated GxP Environments, which covers change control in more depth. I have not reproduced its wording here because the document is long and you should read the relevant chapter directly.

Annex 11 may be revised in future. Check the current status with the regulator or your customer rather than assuming the 2011 text is the final word.

Medical-device customers. The Medical Device Authority (MDA) administers the Medical Device Act 2012 (Act 737), including establishment licensing. According to the MDA FAQ, manufacturers need ISO 13485 certification. Many device makers will therefore ask their laundry to show controlled records, even if the laundry itself is not the licensed manufacturer. Which clauses apply to a given supplier is a matter for that customer’s quality system and certification body, so I will not guess at clause numbers here.

Electronics and semiconductor customers. These customers, common in Penang, Kulim and Selangor, usually care about contamination and ESD performance. Their supplier audits are less likely to cite GMP, but they commonly still ask for controlled, reproducible test records. Treat version control as good practice that serves them too.

What auditors actually ask

In practice the questions are simple and direct:

  1. Which version of the software was in use on the date of this record?
  2. When was it last changed, and who approved that change?
  3. What was tested before the change went live, and where is the evidence?
  4. Did the change affect any limit, calculation or certificate content?
  5. Can you show me the record of the change, not a verbal explanation?
  6. If something went wrong after a release, could you go back, and how would you know which records were affected?

A laundry that can answer these from documents, in a few minutes, comes across very differently from one that has to “check with whoever set it up”.

A practical release-control routine

You do not need a heavy process. You need a consistent one.

1. Keep a version log. Every release gets an identifier, a date, a short description and the name of the person who approved it. The log sits with the quality unit, not only with the IT supplier.

2. Record the version on the output. Where possible, the version in force should be traceable from the record or certificate, or at least derivable from the date and the log. If it cannot be derived, that is a gap.

3. Separate “change” from “fix”. A cosmetic fix and a change to a pass/fail limit are not the same risk. Classify changes, and decide in advance which ones need quality approval and re-testing.

4. Test before release, in a separate place. Run a defined set of test cases, including a few known results you can check by hand, in a test environment before you touch the live one. Keep the evidence.

5. Approve before go-live. The quality unit signs off. The person who built the change should not be the only person approving it.

6. Control configuration as well as code. Limits, specifications, certificate templates and user roles are part of the “version”. Annex 11 explicitly names system configurations in its change requirement.

7. Keep a rollback plan. Know how you would return to the previous state, and how you would identify records created in the affected window.

8. Review periodically. Once or twice a year, review the version log, incidents and deviations together. This matches the periodic evaluation Annex 11 describes.

Common weak spots

  • Spreadsheets with no change history. A formula edited silently is a release with no record.
  • Supplier updates that arrive automatically. If a hosted system updates itself, your quality unit still needs to know what changed and when. Ask the supplier how release notes and notice are handled.
  • Single-person systems. One administrator who changes limits and also approves the change is a conflict that auditors notice.
  • No link between a certificate and its software state. A certificate that cannot be tied back to a controlled configuration is weaker evidence.
  • Informal verbal approvals. If it is not written down, it did not happen from the auditor’s point of view.

Costs and proportion

Do not over-build this. For a small or mid-sized Malaysian laundry, the cost is mostly time: a few hours per release for testing and sign-off, and some discipline in keeping the log. Spending a fraction of that effort before a release is almost always cheaper than reconstructing history during a customer audit or an NPRA-linked inspection of your customer. Any ringgit figure depends on your system and supplier, so ask for quotes rather than relying on generic numbers.

What software can and cannot do

Good software can enforce roles, keep an audit trail, stamp records with version and date, and make approvals visible. It cannot make you compliant. Software supports compliance; responsibility for GMP decisions stays with your quality unit and, for released product, with your customer’s quality unit. Treat any supplier claim that a product is “GMP compliant” or “validated” out of the box with caution. Validation is something you do, in your own context, with your own intended use.

A starting checklist

  • Do we have a written change-control procedure that covers software and configuration?
  • Is there a version log owned by the quality unit?
  • Can we tie any past record to the version in force at the time?
  • Do we test and approve before go-live, with evidence kept?
  • Do we know how our software supplier notifies us of updates?
  • Do we review upgrade history and incidents periodically?

If the answer to two or more is no, start there before buying anything.

Talk to us

If you are reviewing how your laundry handles software changes, or planning to replace spreadsheets with a proper system, we are happy to have a no-charge conversation about it. Teknologia Solutions offers our laundry quality control system and can discuss how it might fit your process, with no obligation.


Sources: NPRA Guidance Document, 11th Edition; EU GMP Annex 11 (2011 text, European Commission); PIC/S PI 011-3; MDA FAQ on registration, licensing and enforcement. This article is general information, not regulatory or legal advice. Verify details against the primary sources and the current edition of each document, and confirm requirements with your customers and certification bodies.