Software Version Control for Singapore Cleanroom Laundries
Why auditors ask which software version produced a laundry QC record, and how Singapore cleanroom laundries can control releases under HSA and PIC/S expectations.
- mid
- laundry-qc
- singapore
If an auditor holds a particle count certificate from your cleanroom laundry and asks, “Which version of the software produced this?”, you should be able to answer in minutes, from records, without calling anyone. That is the short answer to why version and release control matter: a record is only as trustworthy as your ability to show what system, in what state, created it.
This article is for quality and operations managers at Singapore cleanroom laundries, and for the pharmaceutical, biomedical, medical-device and semiconductor customers who audit them.
Why the question comes up in Singapore
Singapore’s health products regulator, the Health Sciences Authority (HSA), adopts the PIC/S GMP Guide (PE 009) as the GMP standard for therapeutic products, and expects licensed manufacturers to follow the current edition. Your laundry may not hold an HSA manufacturing licence itself. But your customers might, and they pull their service providers into their own quality systems through supplier qualification and quality agreements.
The PIC/S guide’s Annex 11 covers computerised systems. In the text republished by Health Canada, three ideas matter here:
- Validation is considered across the system’s life cycle, not as a one-off event.
- Changes to a system or program are made under a defined procedure, and significant modifications are validated.
- Changes to critical data are authorised and recorded with a reason, and an audit trail of entries and amendments should be considered.
Check which edition your customer’s auditors work from. Nothing in it says “keep a version number on every record” in so many words. But if you must show a system was changed under control, you need to know what changed and when. That is version control in practice.
What an auditor is actually testing
Auditors rarely care about your software vendor’s technology. They care about four things:
- Reproducibility. If a release decision is questioned two years later, can you show what rules and calculations the system applied at the time?
- Control of change. Was the update requested, assessed, tested and approved by someone accountable, or did it just happen?
- Attribution. Does each record show who did what and when, and does that survive an upgrade?
- Continuity. After an update, are old records intact and still readable?
A laundry might run a pass/fail limit for particle counts. If that limit is edited inside a software update and nobody recorded it, a certificate issued last month and one issued this month may follow different rules while looking identical. That is the scenario version control exists to prevent.
What “controlled release” looks like
You do not need heavy bureaucracy. A small laundry can run a lean process that still stands up:
| Element | What to keep |
|---|---|
| Version identifier | A clear version number or build identifier, visible in the system and traceable to records |
| Release notes | A plain-language list of what changed, including any change to limits, calculations, certificates or user roles |
| Impact assessment | A short note on whether the change touches quality-relevant functions |
| Testing evidence | Proof that the changed functions were checked before use, scaled to risk |
| Approval | Sign-off by the quality unit before the update goes live |
| Rollback plan | How you return to the previous version if something fails |
| Go-live date | The exact date and time the new version took over |
Match the depth to risk. A cosmetic change to a screen label does not need the same scrutiny as a change to how a particle count result is judged.
Tie each record to a version
The practical test: pick any released batch and trace it back. You should be able to see the test results, who reviewed and released it, and which software version was live at that time. If the version is recorded automatically with the record or the audit trail, good. If you can only infer it from an update log by date, that can work, but it is more fragile.
Also keep these points in mind:
- Configuration is part of the version. Acceptance limits, test templates and certificate layouts are settings, not code. Changes to them need the same discipline as an upgrade.
- Hosted or cloud systems change on the vendor’s schedule. Ask whether you get notice, release notes and a chance to test before changes reach your live system. Silent updates are the main risk.
- Spreadsheets count. Many laundries still compute results in spreadsheets. A formula edited without a record is an uncontrolled release too.
- Backup and restore. Restoring an older backup can bring back an older version. Know what that does to records created since.
Questions to ask your software supplier
Whether the system is bought, built or configured, ask:
- How are versions numbered, and can I see the version history?
- Do I get release notes before each update, and who decides when I install?
- Can I test an update before it reaches live data?
- Are limits and templates change-logged?
- What happens to existing records after an upgrade?
- What support do I get, and in which time zone, if a release causes a problem?
The Annex 11 text in the Health Canada link above also expects a written description of the system to be kept up to date, so ask your supplier for documentation that tracks releases.
Cost in Singapore dollars
We will not quote figures, because they depend on scope and we cannot verify market rates. The costs to plan for are the time of your quality staff on testing and approval, supplier support or maintenance fees, and any revalidation effort after major changes. In S$ terms, the larger risk is usually not the fee but a failed customer audit or a held lot while you reconstruct which system state produced a record.
What this does not do
Version control supports compliance; it does not make a laundry or a system “compliant”, “validated” or “certified”. Responsibility stays with your quality unit and the customer’s quality unit. Your customer’s quality agreement and the regulator’s current requirements decide what is actually required.
A practical starting point
- List every system that creates or changes a quality record, including spreadsheets.
- Write a one-page change procedure: request, assess, test, approve, release, record.
- Add a version field or log that links each release to a go-live date.
- Do a mock audit: pick three released batches and trace each to its version and approver.
- Review the process after any major update.
Talk to us
If you are working out how to control releases in your laundry quality system, or reviewing what you have, Teknologia Solutions is happy to have a no-charge conversation. Our laundry quality control system is one option, and we will tell you plainly if a simpler approach fits you better.
Sources: HSA, GMP and GDP standards; Health Canada, PIC/S Annex 11: Computerised Systems (archived). The Health Canada page is a republication of an earlier PIC/S Annex 11 edition. Verify all requirements against the primary sources, the current PIC/S PE 009 edition and the current editions of any standards, as these change.